Reference
Questions & answers
Straight answers on delivery, installation, payment and sizing.
6 answers·Updated 2026
01DeliveryHow long does delivery take?
Four weeks from order to installation. Your shed is manufactured to order on our CNC production line, and your delivery date is agreed when you order, not left open-ended. Most suppliers quote 8 to 32 weeks; our whole production model is built around not making you wait.
02InstallHow long does installation take?
Half a day. Your shed arrives flat-packed as numbered, pre-drilled, pre-aligned panels on a steel delivery rack. Our team assembles it on site, usually finished before lunch, with no extended site works.
03PaymentWhy is payment taken in full at the time of order?
Every shed is made to order. Your payment books your slot on the production line and locks in your price. In return you get a firm delivery date up front. You can pay by bank transfer against our invoice, with no card fees.
04OptionsWhat sizes and colours are available?
Eighteen standard sizes across three ranges: small (1.1m deep), medium and large (up to 7m × 3m), each in a choice of box-profile cladding colours. Need something else? Custom widths and depths are a normal order for us: call or WhatsApp with your measurements.
05AreaWhere do you deliver and install?
All of Ireland. We manufacture in Kilclare, Carrick-on-Shannon, Co. Leitrim, and deliver flat-pack anywhere in Ireland. The panel system also suits confined or hard-to-reach sites.
06SiteDo I need to prepare a base?
A firm, level base gives the best result. Tell us about your site when you order (there's a notes field) and we'll advise what's needed before installation day.
Something else on your mind? Get in touch, or call +353 86 609 9013.