Start to finish
Five things happen, in this order.
Your shed is delivered flat-pack and put up on site.
Open photograph full screenPhotographed on site 01
Leaving the yard
It leaves our yard in Kilclare
Your shed is loaded onto our lorry and brought to your address.

Filmed on site 02
Unloading
The lorry unloads with its own crane
The load is lifted off the lorry and set down beside your base.
Room for the lorry to get within reach of where the shed is going.
Open photograph full screenPhotographed on site 03
Setting out
Everything is set out on site
The parts are laid out beside the base, ready for the build.
Open photograph full screenPhotographed on site 04
Frame up
The steel frame goes up
The frame is assembled on your base.
A finished, level base.
Open photograph full screenPictured: a finished shed from an earlier build 05
Yours
And then it is yours
Painted steel, so there is nothing to treat and nothing to repaint. Sweep the floor and start filling it.
Before we arrive
Three things we cannot bring with us.

01A base, finished before the date
Firm, level, and slightly bigger than the shed on every side. Your own builder lays it. We ask about it in every order, before a payment is taken.
What we ask about your base02Room for the lorry
We arrive on a lorry with a crane. If the gateway or the lane is tight, tell us when you order.
03Someone on site
Somebody who can show us where the shed goes and which way the doors face.
Not sure about your spot?
Send us a photo of where it is going.
Send us a picture of the spot and we will take a look before you order anything.